1. Requirements for substation construction
1.1 General
To build a high-voltage substation, a number of components need to be positioned and sized as accurately as possible in order to create the appropriate electrical diagram.
The layout of these components must meet certain conditions, dictated by the twin concerns of operational safety and the lowest possible cost of construction or operation. These construction conditions can be broken down into :
voltage conditions ;
conditions related to the thermal effects of current ;
safety conditions for operating personnel ;
conditions related to the mechanical stresses exerted on the structures ;
...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Requirements for substation construction
Article included in this offer
"Electricity networks and applications"
(
184 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Regulations
Arrêté interministériel (JO du 2 avril 1991): Electricity, technical conditions of distribution. New measures.
Standardization
International standards
International Electronics Commission IEC
- Coordination de l'isolement. - 71 -
- Insulation coordination: 1re part: terms, definitions, principles and rules. - 71–1 - 1976
- Coordination...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!