Procedure prior to the construction of an overhead line
Integrating overhead lines into the environment
Article REF: D4445 V1
Procedure prior to the construction of an overhead line
Integrating overhead lines into the environment

Authors : Guy LAURENT, Denis GHIAZZA

Publication date: May 10, 1997 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

1. Procedure prior to the construction of an overhead line

1.1 Impact study

The procedure prior to the construction of an overhead line consists of studying, under the supervision of the administrative authorities, the environmental parameters likely to be affected by the construction of a line.

The impact study begins with EDF sending an economic justification file for the planned line, together with a proposed study area, to the DIGEC (the French Ministry of Industry's Gas, Electricity and Coal Department) for very-high-voltage (VHV) lines, and to the DRIRE (the French Regional Department for Industry, Research and the Environment) for high-voltage lines.

If the project is accepted, an initial consultation is launched under the aegis of the prefect, in the presence of elected representatives,...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Electricity networks and applications"

( 184 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details