1. Procedure prior to the construction of an overhead line
1.1 Impact study
The procedure prior to the construction of an overhead line consists of studying, under the supervision of the administrative authorities, the environmental parameters likely to be affected by the construction of a line.
The impact study begins with EDF sending an economic justification file for the planned line, together with a proposed study area, to the DIGEC (the French Ministry of Industry's Gas, Electricity and Coal Department) for very-high-voltage (VHV) lines, and to the DRIRE (the French Regional Department for Industry, Research and the Environment) for high-voltage lines.
If the project is accepted, an initial consultation is launched under the aegis of the prefect, in the presence of elected representatives,...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Procedure prior to the construction of an overhead line
Article included in this offer
"Electricity networks and applications"
(
184 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
References
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!