4. Cable link construction and operation
4.1 General
The study of an underground transmission or distribution link must first define the following points:
the most appropriate cable technology, taking into account the characteristics of the link, in particular its length, installation and operating conditions;
cable sizing, taking into account the load to be carried and its foreseeable future evolution, short-circuit current and, possibly, voltage drop problems;
the initial investment cost and subsequent operating costs, including any maintenance costs.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Cable link construction and operation
Article included in this offer
"Electricity networks and applications"
(
184 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
References
HV and HVB cables
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!