4. Cable link construction and operation

4.1 General

The study of an underground transmission or distribution link must first define the following points:

  • the most appropriate cable technology, taking into account the characteristics of the link, in particular its length, installation and operating conditions;

  • cable sizing, taking into account the load to be carried and its foreseeable future evolution, short-circuit current and, possibly, voltage drop problems;

  • the initial investment cost and subsequent operating costs, including any maintenance costs.

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
Cable link construction and operation

Article included in this offer

"Electricity networks and applications"

( 184 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us