3. Soil liquefaction studies for construction projects
3.1 Study organization chart
The identification of potentially liquefiable soils during geotechnical site surveys for construction projects, followed by the design of structures, is carried out in stages.
Figure 14 shows a diagram of how the studies are organized. The various stages are described below.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Soil liquefaction studies for construction projects
Article included in this offer
"Soil mechanics and geotechnics"
(
42 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!