Manufacturing launch
Specification of castings. Standardization. Engineering
Article REF: M3540 V1
Manufacturing launch
Specification of castings. Standardization. Engineering

Author : Pierre CUENIN

Publication date: December 10, 1997 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

3. Manufacturing launch

Once the raw part drawing has been drawn up, and to prepare for the manufacturing launch of a part (especially for series production), a file will be established which will define: production rates, lead times, acceptance conditions, etc., data which will serve as a basis for drawing up the necessary technical documents:

  • instruction sheets, specifying all manufacturing parameters for the various production operations: melting, molding, coremaking, finishing, inspection;

  • routings, which will indicate all production cost elements: machine time, labor time, material consumption, calibration, etc. ... ;

  • the tooling sheets that will enable us to launch the design and production of all the tooling required for manufacturing.

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Metal forming and foundry"

( 122 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us