3. Manufacturing launch
Once the raw part drawing has been drawn up, and to prepare for the manufacturing launch of a part (especially for series production), a file will be established which will define: production rates, lead times, acceptance conditions, etc., data which will serve as a basis for drawing up the necessary technical documents:
instruction sheets, specifying all manufacturing parameters for the various production operations: melting, molding, coremaking, finishing, inspection;
routings, which will indicate all production cost elements: machine time, labor time, material consumption, calibration, etc. ... ;
the tooling sheets that will enable us to launch the design and production of all the tooling required for manufacturing.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Manufacturing launch
Article included in this offer
"Metal forming and foundry"
(
122 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
References
In Engineering Techniques
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!