2. When do you need to draw up a hazard analysis?
The hazard study must be carried out in one of the following cases:
preparation of an application for authorization to operate (DDAE) for a new plant;
completion of a DDAE as part of an administrative regularization or modification of operating conditions involving a significant change in relation to authorized operating conditions, deemed significant by the prefect;
projects for the creation of an installation or structure for which a special intervention plan must be drawn up (in application of article 15 of loi n° 2004-811 du 13 août 2004 de modernisation de la sécurité...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
When do you need to draw up a hazard analysis?
Article included in this offer
"Chemical risk prevention manager"
(
218 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Also in our database
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!