Practical sheet | REF: FIC0544 V1

Risk management measures – Performance criteria

Author: Olivier IDDIR

Publication date: September 10, 2012, Review date: November 27, 2016 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


6. Mistakes to avoid

6.1 Don't confuse efficiency with probability of failure

If an MMR is not effective against a scenario, it cannot be valued as an MMR. Taking it into account in the ESD by associating a probability of failure is not correct and leads to an under-assessment of the risk. The probability of failure of an MMR can only be taken into account after verification of its effectiveness in relation to the scenario studied.

SCROLL TO TOP

6.2 Don't confuse the duration of the leak with the response time of an MMR designed to isolate a leak.

...
You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Chemical risk prevention manager

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Mistakes to avoid