Practical sheet | REF: FIC1697 V1

Estimating costs

Author: Jean-Pierre PAYRE

Publication date: October 10, 2020 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!

Automatically translated using artificial intelligence technology (Note that only the original version is binding) > find out more.

    A  |  A

    5. Formalizing results

    Once the estimate has been made, the result must be formalized with the following information:

    • presentation of assumptions used in the estimate ;

    • identification of the method used and the degree of precision expected ;

    • results presentation ;

    • propose sensitivity studies, changing certain parameters to assess the impact of different variants.

    SCROLL TO TOP
    You do not have access to this resource.

    Exclusive to subscribers. 97% yet to be discovered!

    You do not have access to this resource.
    Click here to request your free trial access!

    Already subscribed? Log in!


    The Ultimate Scientific and Technical Reference

    A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
    + More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
    From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

    This article is included in

    Design and engineering management

    This offer includes:

    Knowledge Base

    Updated and enriched with articles validated by our scientific committees

    Services

    A set of exclusive tools to complement the resources

    Practical Path

    Operational and didactic, to guarantee the acquisition of transversal skills

    Doc & Quiz

    Interactive articles with quizzes, for constructive reading

    Subscribe now!

    Ongoing reading
    Formalizing results