3. Diagnose whether the technical system under study complies with the law of integrity
Reaching the conclusion that four elements are responsible for the realization of FPU requires a critical analysis of the technical system under consideration. The corollaries to the law of integrality are as follows:
each element must play a full part in the smooth running of the system;
at least one of the parts must be controllable to accommodate variations in the control element.
With these corollaries in mind, you need to identify whether each component is fulfilling its intended role. In the example of the hammer, does the grip part of the handle effectively transform muscular energy into mechanical driving energy? The answer is no! There are losses due to the fact that the immobilization assumed by the user's hand is not total. This raises the question of the possible...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Diagnose whether the technical system under study complies with the law of integrity
Article included in this offer
"Management and innovation engineering"
(
433 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!