Modeling a PRS (Power Recovery System)
Banki-Michell turbine PRS for energy recovery and water leakages reduction
Article REF: BM4290 V1
Modeling a PRS (Power Recovery System)
Banki-Michell turbine PRS for energy recovery and water leakages reduction

Authors : Antonietta SIMONE, Orazio GIUSTOLISI

Publication date: February 10, 2021 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

3. Modeling a PRS (Power Recovery System)

The PRS device is obtained by introducing a diffuser downstream of the impeller in traditional Banki-Michell units. This diffuser allows the flow rate to leave the impeller under pressure, enabling it to be inserted in water distribution networks with reduced pressures and losses, extended network service life, reduced treatment and pumping costs, and energy recovery.

The PRS consists of five main parts: convergent tube, nozzle, Cink control device

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

""

( 81 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details