Adaptation of existing diking systems
Diagnosis and Adaptation of Levee Systems
Article REF: TRP5003 V1
Adaptation of existing diking systems
Diagnosis and Adaptation of Levee Systems

Author : Marc IGIGABEL

Publication date: February 10, 2017 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

5. Adaptation of existing diking systems

Adapting a diking system requires the study and comparison of different options, which can be very different in terms of the principles implemented. The project must be carried out in compliance with regulatory requirements, particularly in terms of safety and the environment. It must also be economically justified.

5.1 Adaptation principles

The adaptation of diking systems must be considered on several scales:

  • on the scale of a river watershed or a coastal sedimentary unit;

  • on the scale of the diking system ;

  • on the scale of the structure (we'll consider a dike-type structure here).

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

""

( 81 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details