Objectives
Electric flash butt welding of railways rails
Article REF: BM7780 V1
Objectives
Electric flash butt welding of railways rails

Author : Raymond DEROCHE

Publication date: November 10, 2013 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

2. Objectives

2.1 Metallurgy

The metal of the two rail ends, almost in contact, is progressively heated to the melting point on the surface of the ends, so that the iron vapors prevent oxidation of the faces to be welded. The forging that follows has an active stroke of 15 to 16 mm interpenetration, under a pressure of 60 MPa, resulting in complete recrystallization and the two ends behaving as a monoblock.

AC welding machines, with their often high sinusoidal overvoltages, often produced large sparks and craters, which were filled with various inclusions not expelled by the forging process (Figures 1 and 2...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Railway systems"

( 56 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us