Weld finishing. Defectology
Electric flash butt welding of railways rails
Article REF: BM7780 V1
Weld finishing. Defectology
Electric flash butt welding of railways rails

Author : Raymond DEROCHE

Publication date: November 10, 2013 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

7. Weld finishing. Defectology

Finishing the welds consists of three simple steps:

  • slicing the bead (figure 8 );

  • straightening of the weld zone over 1.50 m on either side of the welded joint (figure 13 ) by manual pressing controlled by laser passage (in TGV rail, the weld peak must not exceed 0.3 mm over 3 m);

  • finish-grind the headstock to ensure shock-free wheel travel (figure 14 ).

Defectology: apart from...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
Weld finishing. Defectology

Article included in this offer

"Railway systems"

( 56 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us