6. Representative example
The model was validated on two installations:
1) a mess hall (including a 1,000 square metre hall) serving a military base (figure 1 );
2) a teaching facility, comprising two conference halls.
The aim of the central building unit at the Ministry of Defense, which maintains these facilities, was to rehabilitate them to a level not exceeding 1.2 million NIS (New Israeli Shekel) during the coming calendar year.
The local unit required additional constraints, concerning the plant's performance level and service life, as follows:
1) Refurbishment must enable these two buildings to be used at an average but still acceptable level of performance (3 on a scale of 5);
...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Representative example
Article included in this offer
"Control and systems engineering"
(
143 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
References
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!