Article | REF: S7214 V1

Multi-criteria optimization - Application in the construction industry

Authors: Igal M. SHOHET, Eldad PERELSTEIN

Publication date: June 10, 2001 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!

Automatically translated using artificial intelligence technology (Note that only the original version is binding) > find out more.

    A  |  A

    6. Representative example

    The model was validated on two installations:

    1) a mess hall (including a 1,000 square metre hall) serving a military base (figure 1 );

    2) a teaching facility, comprising two conference halls.

    The aim of the central building unit at the Ministry of Defense, which maintains these facilities, was to rehabilitate them to a level not exceeding 1.2 million NIS (New Israeli Shekel) during the coming calendar year.

    The local unit required additional constraints, concerning the plant's performance level and service life, as follows:

    1) Refurbishment must enable these two buildings to be used at an average but still acceptable level of performance (3 on a scale of 5);

    ...

    You do not have access to this resource.

    Exclusive to subscribers. 97% yet to be discovered!

    You do not have access to this resource.
    Click here to request your free trial access!

    Already subscribed? Log in!


    The Ultimate Scientific and Technical Reference

    A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
    + More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
    From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

    This article is included in

    Control and systems engineering

    This offer includes:

    Knowledge Base

    Updated and enriched with articles validated by our scientific committees

    Services

    A set of exclusive tools to complement the resources

    Practical Path

    Operational and didactic, to guarantee the acquisition of transversal skills

    Doc & Quiz

    Interactive articles with quizzes, for constructive reading

    Subscribe now!

    Ongoing reading
    Representative example