Practical sheet | REF: FIC0502 V1

Terminate ICPE activities subject to registration and/or authorization

Author: Solange VIGER

Publication date: November 10, 2011 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


4. Implement and monitor restoration

4.1 Implementation of restoration measures

The operator implements the reclamation requirements set out in his brief or by the Prefect.

When the work specified in the memorandum or prescribed by the Prefect has been completed, the operator informs the Prefect.

The inspector of classified installations draws up an official report confirming that the work has been carried out. The inspector forwards the report to the prefect, who sends a copy to the operator, the mayor or the president of the local authority responsible for urban planning, and the landowner.

SCROLL...
You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Environment

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Implement and monitor restoration