3. Conclusion
Designing a formwork rotation for a project for which the company has been awarded a contract is a job that must be done successfully, as the financial equilibrium of the site often depends on it, and the company's survival may well depend on it.
In order to carry out the rotation study, the company needs to have access to a large library of job site reports, showing the times allocated and the times actually worked, as well as the equipment use sheets for the job site, compared with the equipment sheets drawn up by the formwork manufacturer.
Achieving optimum rotation is not easy on the first try, but don't despair.
The formwork is used by teams of "formworkers" supervised by a hierarchy; these teams must have been trained in the use of the equipment to achieve optimum yields, without damaging the equipment. The formworkers must understand the constraints of using this equipment...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Conclusion
Bibliography
-
INRS - Prévention du risque de renversement des banches sous l'effet du vent. - Recommandation [R 399] (2004).
Also in our database
-
SERIN (P.) - Cycle de réalisation d'ouvrages. Rotation du matériel. - [TBA 525]...
Events
Batimat: international construction show, held every two years at Paris-Villepinte http://www.batimat.com
Expomat: international construction equipment show, held every two years at Paris-Villepinte https://paris.intermatconstruction.com/
Directory
Manufacturers, sellers and renters of metal and cardboard formwork (non-exhaustive list)
HUSSOR http://www.hussor.com
DEKO http://www.deko.fr
SATECO http://www.sateco.fr
OUTINORD
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!