2. Resources required for daily cutting
SCROLL TO TOP
2.1.1 Bill of materials
The schedule has been drawn up on a "day-by-day" basis, so it is possible to draw up a summary of daily site operations.
Day-by-day" work is what appears on the planning graph based on one of the scheduling methods: potential-stage planning, or potential-task planning.
SCROLL TO TOP
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Resources required for daily cutting
Bibliography
-
INRS - Prévention du risque de renversement des banches sous l'effet du vent. - Recommandation [R 399] (2004).
Also in our database
-
SERIN (P.) - Cycle de réalisation d'ouvrages. Rotation du matériel. - [TBA 525]...
Events
Batimat: international construction show, held every two years at Paris-Villepinte http://www.batimat.com
Expomat: international construction equipment show, held every two years at Paris-Villepinte https://paris.intermatconstruction.com/
Directory
Manufacturers, sellers and renters of metal and cardboard formwork (non-exhaustive list)
HUSSOR http://www.hussor.com
DEKO http://www.deko.fr
SATECO http://www.sateco.fr
OUTINORD
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!