INTRODUCTION
The study of concreting cycles involves the rotation of formwork, the key component of the shell of a reinforced concrete building.
Starting with a description of the structure, we'll be looking at the hierarchy of constraints to be met, the number and size of teams ("floor" team, "wall" team, "prefabrication" team), their organization in co-activity for routine work and for all special points (gable walls, stairwells and elevators, etc.), as well as the equipment load plan (PPSPS for each company).
Safety must be integrated into every action. The results of this study will be recorded in summary documents and plans, which will be made available to all those involved in the construction process, and will form the "roadmap", the backbone of the structural work.
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
KEYWORDS
Floors
| Concrete walls
| Prefabrication
Ongoing reading
Construction cycle. Documents and detailed scheme