5. Site preparation process diagram
The visit can be virtual, thanks to photos, the Internet and topographical surveys.
The DCE (dossier de consultation des entreprises) must include a number of elements enabling each company to draw up a site installation plan.
With Google Maps, knowing the address of the site, it is possible to see the terrain (recognized thanks to the ground plan provided in the DCE), its nature, its environment (roads, paths, HV lines and pylons...). The Street View function allows you to obtain an elevation, assess the height of HV lines, the existence of ditches, the presence of electricity distribution substations...
Microsoft's Bing Maps application gives equivalent results, but as the aerial shots were taken at different times, it is possible to see differences...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Site preparation process diagram
Bibliography
-
(1) - HAXAIRE (P.), DEBAVEYE (H.) - 170 séquences pour mener une opération de construction, - Le Moniteur, 2020.
-
(2) - COUFFIGNAL (D.), BÉRAUD-GUÈNARD (S.) - Correspondancier des opérations de construction, - 2013.
Also in our database
Standards and norms
- Marchés privés - Cahiers types - Cahier des clauses administratives générales applicable aux travaux de bâtiment faisant l'objet de marchés privés - NF P03 0001 - Octobre 2017
Regulations
Recommendation R. 459 – Improvement of working conditions in tower cranes [obsolete, replaced by R. 495].
Directory
FFB (French Building Federation)
http://www.ffbatiment.fr
FNTP (National Federation of Public Works)
http://www.fntp.fr
CAPEB (Confederation of building craftsmen and small businesses)
http://www.capeb.fr
...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!