6. Tower crane stabilization
INRS has published a brochure
and a calculation tool for determining the "out-of-service wind" on a construction site, i.e. the maximum wind for which the crane is designed to remain stable when not in use.
Tower cranes are used to handle loads on construction sites. When the wind speed exceeds 72 km/h, the crane must be taken out of service. The crane must also be stabilized according to a maximum out-of-service wind speed defined by the user, depending on the...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Tower crane stabilization