4. Building materials and installation
Today, teams of specialized roofers are needed to carry out this type of work. Their skills combine stone-cutting, installation and connection work, in collaboration with carpenters.
Certain steps are essential before implementation, such as :
sorting the slates or lauzes: sorting consists of classifying the lauzes along the lines of the schist, and grouping them by size and thickness;
checking the quality of the stones: probing is the practice of tapping on the lauze with a hammer (figure 1); you can tell by ear whether the lauze is defective;
adjusting elements according to their size and shape, in order to deal with singular points on the roof;
...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Building materials and installation
Standards
- Building work – Construction of timber-frame houses and buildings – Part 1-2: General material selection criteria (CGM) – 3.1.1.1 Structural solid wood - NF DTU 31.2 P1-2 - 01-11
Documentation
Thierry CHAPOULIE [email protected]
Inventory of France's intangible cultural heritage : fondation du patrimoine [email protected]http://www.fondation-patrimoine.com
Maisons paysannes de France
Founded in 1965, Maisons Paysannes...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!