9. Construction method and schedule
For a site of less than 50 km2, the main dike and the channel dikes can be built by land-based means, and the channel gate infrastructure built in the dry under the shelter of a cofferdam.
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Construction method and schedule
Bibliography
-
(1) - GIBRAT (R.) - Scientific aspects of the use of tidal energy - (1975).
-
(2) - COTILLON (J.) - Sept années d'exploitation de l'usine de La Rance - (1974).
-
(3) - ANDRITZ - New bulb unit technologies for tidal powerplants - . Hydropower &Dams, avr. 2007.
...
Also in our database
-
LEMPÉRIÈRE (F.) - Quelles usines marémotrices pour le XXIe siècle. - Techniques de l'Ingénieur [BE 8 573]...
Events
EMR Symposium: Brest 2013
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!