7. Dynamics required for back-up (EnRi/Load case = 100%)
Backup resources must adapt their power (positive or negative) to complement that of the renewable energies and match the remaining load. Balancing the grid requires power plants or back-up technologies to follow rapid, high-amplitude transients, which are characterized in the following. We examine evolutions over two months, one summer and one winter, then present quantitative results summarizing the characteristics of transients over the year.
SCROLL TO TOP
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Dynamics required for back-up (EnRi/Load case = 100%)
Bibliography
-
(1) - WAGNER (F.) - Feature of an electricity supply system based on variable input. - IPP Report, 18(1) (2012).
-
(2) - WAGNER (F.) - Electricity by intermittent sources : an analysis based on the German situation 2012. - Eur. Phys. J. Plus, 129, p. 20 (2014).
-
(3)...
Also in our database
-
FLOCARD (H.), PERVES (J.-P.), HULOT (J.-P.) - Électricité et intermittence des énergies renouvelables. -
Websites
GRAND Dominique, LE BRUN Christian and VIDIL Roland, Realistic Energy Notre futur énergétique à l'épreuve du réel http://realisticenergy.info (page consulted on February 20, 2015)
MACKAY David, Sustainable energy, without the hot air http://www.withouthotair.com (page consulted on February...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!