2. Batch shop operation
Workshop planning and scheduling, which can be considered as sub-problems of the design phase (see figure 2 ), are dealt with first. This choice is explained by the fact that, although design takes place at the very beginning of the process life cycle, it is essential to first present the general concepts common to both issues.
2.1 Planning and scheduling
Planning and scheduling activities involve allocating limited resources between competing activities to meet needs efficiently.
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Design and production
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Batch shop operation
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference