2. Batch shop operation
Workshop planning and scheduling, which can be considered as sub-problems of the design phase (see figure 2 ), are dealt with first. This choice is explained by the fact that, although design takes place at the very beginning of the process life cycle, it is essential to first present the general concepts common to both issues.
2.1 Planning and scheduling
Planning and scheduling activities involve allocating limited resources between competing activities to meet needs efficiently.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Batch shop operation
Article included in this offer
"Design and production"
(
139 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!