4. Performance criteria
4.1 In scheduling
The quality of a scheduling solution is based on three main sets of criteria.
-
Product-oriented" criteria based on completion times :
minimization of total manufacturing time or makespan ;
minimizing maximum product residence time;
minimizing average product residence times.
-
Equipment-oriented" criteria based on equipment inventory and use:
equipment utilization rate ;
the number of work-in-progress (WIP) ;
the minimization...