Our advice
Risk management measures – Performance criteria
Practical sheet REF: FIC0544 V1
Our advice
Risk management measures – Performance criteria

Author : Olivier IDDIR

Publication date: September 10, 2012, Review date: November 27, 2016 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

5. Our advice

5.1 Check performance with on-site tests

When assessing the performance of an MMR in the face of an accident scenario, it is imperative to check that the performance criteria announced in the ESD are in line with the observations made on site.

For example, if the response time for an MMR whose function is to close isolating devices is announced as 20 seconds in the EDD, and during an audit the time measured is 40 seconds, the DREAL inspector will be able to :

  • or request a reassessment of the consequences of the scenario resulting from the operation of the MMR (if these had been defined in the EDD on the basis of 20-second isolation);

  • or consider that the manufacturer is not monitoring...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Safety and risk management"

( 460 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details