6. What are the filling requirements?
Once the "ESPT" or "GRV" has been chosen, care must be taken to ensure that the maximum filling rate is respected, so as to exclude any rupture, leakage of contents or permanent deformation of the "ESPT" or "GRV" due to the expansion of the material under the effect of temperature variations.
6.1 Filling "IBCs
For "IBCs", the maximum rate to be respected can be a specific rate given by the packing instruction, or a general standard rate, the calculation formula for which is given in § 4.1.1.4 of the ADR.
In addition, the seventh number between slashes in the "IBC" approval mark ("1500" in the figure "Example of an IBC approval mark") indicates the maximum permissible gross mass for which the equipment is designed. When selecting and...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
What are the filling requirements?
Article included in this offer
"Safety and risk management"
(
461 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Also in our database
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!