4. Installation and operation
4.1 Pre-assembly precautions
Assembly operations must be carried out with the machine at a standstill, locked and secured. The equipment must be under atmospheric pressure, at room temperature, degassed and purged. All control valves must be locked.
The way in which the trim is handled is of paramount importance. The installation instructions for all seals must be read carefully and followed. Please refer to the Guide to Installation, Commissioning and Maintenance of Mechanical Seals [1] [Doc. BM 5 426].
SCROLL TO TOPExclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Installation and operation
Article included in this offer
"Mechanical functions and components"
(
201 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!