6. Process implementation
6.1 Preparing drafts
The method of obtaining blanks is linked to the flow-forming process.
Tapered flow-forming uses cut or sheared blanks from rolled sheet metal. Pre-forming becomes necessary to obtain cones with a very narrow angle (α < 12°).
In cylindrical flow forming, the short-length starting cup is obtained :
mass machining, for small production runs (10 to 100 parts);
stamping or extrusion followed by machining, for medium and large production runs (from a few hundred to tens of thousands of parts).
The qualities required for these parts include surface finish, thickness consistency and microstructure....
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Process implementation
Article included in this offer
"Material processing - Assembly"
(
162 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!