Conclusion
Nuclear Reactors - Generalities 1. Boilers and Fuel Cycle - Systems - Main Constraints

Add to my library

BN3020 V2 Article

Conclusion


Nuclear Reactors - Generalities 1. Boilers and Fuel Cycle - Systems - Main Constraints

Author : Jean-Baptiste THOMAS

Publication date: July 10, 2026 | Lire en français

Add to my library Add to my library

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

4. Conclusion

Nuclear fission is a renewable energy source capable of supporting a human population that would remain “sustainable” for the Earth’s natural resources as a whole.

The key to this sustainability is the regeneration of spent fissile nuclei. Nuclear energy is well-positioned relative to other renewable energy sources in terms of cost-benefit ratio.

After a meteoric start, a period of rapid development, and strong growth, the momentum was halted in the 1970s. Hopes for a “renaissance” around 2000–2004 were dashed by the 2008 crisis, exacerbated by the Fukushima accident in 2011. The recovery is driven by growth in Asia and the prospect of fleet renewal in Europe and the United States beyond 2030/2040.

Optimizing a multi-tiered Gen-IV-type fleet is the challenge of the end of the century.

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Nuclear engineering"

( 164 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details

Dans les ressources documentaires

Réacteurs à eau ordinaire pressurisée

Cet article réalise un tour d'horizon sur la conception des réacteurs à eau sous pression (de 600 à 1 500...

Uranium : ressources, consommation et évolutions du marché

Cet article s’attache à exposer et à analyser la formation du marché de l'uranium. Un bref résumé des don...

Tous les livres blancs
Article Le Fukushima d'AREVA
23 February 2015
Le Fukushima d'AREVA

Avec une perte annuelle pré-évaluée à 4,9 milliards d'euros en 2014, les choix stratégiques d'AREVA suscitent de profondes inquiétudes.

Article EPR de Flamanville : démarrage en vue
11 July 2024
EPR de Flamanville : démarrage en vue

Le réacteur de l’EPR de Flamanville a chargé son combustible mi-mai et devrait diverger en juillet. L’ASN continue de surveiller de près les différentes phases ...

Toutes les actualités
Contact us