Which projects should be selected and how should they be financed?
Conducting an energy audit on an industrial site

Add to my library

FIC1773 V2 Practical sheet

Which projects should be selected and how should they be financed?


Conducting an energy audit on an industrial site

Author : Léon NOUINDE

Publication date: October 10, 2025 | Lire en français

Add to my library Add to my library

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

5. Which projects should be selected and how should they be financed?

Picto outil Tool
Energy audit methodology, Deming wheel

5.1 What work needs to be planned?

The next step is to select the work to be carried out based on the estimated energy savings they can generate. Among the possible measures, the auditor may propose:

...
You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
Which projects should be selected and how should they be financed?

Article included in this offer

"Energy resources and storage"

( 208 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details

Contenus associés

Sur le même sujet

Veille personnalisée : Inscrivez-vous !
Contact us