9. Construction method and schedule
For a site of less than 50 km 2 , the main dike and the channel dikes can be built by land-based means, and the channel gate infrastructure built in the dry under the shelter of a cofferdam.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Construction method and schedule
Article included in this offer
"Energy resources and storage"
(
201 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!