2. Opportunity study

The second step is to carry out a pre-feasibility study.

First of all, we carry out a pre-dimensioning of the photovoltaic system.

This means assessing the solar potential. This step involves estimating the power of the photovoltaic system in relation to the available surface area of the building or plot of land under consideration, and then the annual production of this system according to the power envisaged and the type of installation.

The output of a photovoltaic system is generally expressed in kWp, or MWp for larger systems. It depends directly on the power and number of modules installed.

Wp for watt peak.

In 2021, the most common modules will have an output of around 320 Wp and a surface area of around 1.65 m....

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Energy resources and storage"

( 201 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us