Construction
Power Plants. Operation and maintenance
Quizzed article REF: BE8576 V1
Construction
Power Plants. Operation and maintenance

Author : Benjamin FRITZ

Publication date: June 10, 2022 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

1. Construction

The elements required for the correct implementation of a PV (photovoltaic) installation are derived directly from the technical inspection report, which should be adapted to the customer's portfolio of projects.

In addition to assessing the solar potential, this involves analyzing the electrical connection (single- or three-phase, size of existing socket, existing environment), assessing cable distances and routing, as well as the condition of the land or roof, and supplementing this information with a risk analysis.

For more information on photovoltaic system design, generator components and feasibility studies, see

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Energy resources and storage"

( 201 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us