Dynamics required for back-up (EnRi/Load case = 100%)
Intermittent renewable energies and electricity supply system
Research and innovation REF: IN301 V1
Dynamics required for back-up (EnRi/Load case = 100%)
Intermittent renewable energies and electricity supply system

Authors : Dominique GRAND, Christian LE BRUN, Roland VIDIL

Publication date: July 10, 2015 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

7. Dynamics required for back-up (EnRi/Load case = 100%)

7.1 Transitional for auxiliary means

Backup resources must adapt their power (positive or negative) to complement that of the renewable energies and match the remaining load. Balancing the grid requires power plants or back-up technologies to follow rapid, high-amplitude transients, which are characterized in the following. We examine evolutions over two months, one summer and one winter, then present quantitative results summarizing the characteristics of transients over the year.

SCROLL TO TOP

7.2 Illustration over a summer month

...
You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
Dynamics required for back-up (EnRi/Load case = 100%)

Article included in this offer

"Energy resources and storage"

( 200 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details