First-phase developments
Tidal plants for the twenty-first century
Article REF: BE8573 V1
First-phase developments
Tidal plants for the twenty-first century

Author : François LEMPÉRIÈRE

Publication date: July 10, 2013 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

9. First-phase developments

The three main sites, totalling 30 GW, are very attractive, but will not be equipped until more modest developments have optimized techniques, verified impacts and specified costs.

It therefore seems a good idea to study which sites would be favourable, in the range of 0.5 to 1.5 GW, in order to select two to be built by 2030.

Such a development will in fact be a semicircular lake with a 10 to 20 km footprint along the coast: it must have a favorable impact on the environment by protecting the coast while maintaining the rhythm and amplitude of the tides in the lake (reduced by 1 to 2 m at spring tide). It must not impede access to existing harbors, but could enable the creation of an all-weather yachting and fishing harbor at a rooted location. It can protect existing aquaculture and facilitate its development. Such a development could...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Energy resources and storage"

( 201 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us