9. First-phase developments
The three main sites, totalling 30 GW, are very attractive, but will not be equipped until more modest developments have optimized techniques, verified impacts and specified costs.
It therefore seems a good idea to study which sites would be favourable, in the range of 0.5 to 1.5 GW, in order to select two to be built by 2030.
Such a development will in fact be a semicircular lake with a 10 to 20 km footprint along the coast: it must have a favorable impact on the environment by protecting the coast while maintaining the rhythm and amplitude of the tides in the lake (reduced by 1 to 2 m at spring tide). It must not impede access to existing harbors, but could enable the creation of an all-weather yachting and fishing harbor at a rooted location. It can protect existing aquaculture and facilitate its development. Such a development could...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
First-phase developments
Article included in this offer
"Energy resources and storage"
(
201 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!