4. Lifting station
4.1 Principle
A lift station is sometimes necessary for:
bring wastewater to the top of an infiltration mound;
supply a vertical drained sand filter so that the treated water can be discharged into an outlet (in the event of a slight difference in level between the wastewater outlet of the dwelling and the outlet);
supply other treatment devices according to the topography of the terrain, wastewater outlet levels, and excavation depths to be observed.
The lifting station is either prefabricated (in kit form) or not, and must be equipped with a removable plug. It includes (figure
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Lifting station
Article included in this offer
"The finishing and equipment of the building"
(
89 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!