Article | REF: C2276 V2

Quality of concrete

Author: Michaël DIERKENS

Publication date: August 10, 2016 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!

Automatically translated using artificial intelligence technology (Note that only the original version is binding) > find out more.

    A  |  A

    3. Inspection during installation

    3.1 On-site inspection before concrete placement

    The control of the equipment used is carried out as part of the contractor's internal control, in accordance with the requirements of his Quality Plan. The findings are submitted to the project manager to enable him to remove the critical or stopping points corresponding to the different phases of the worksite (see article [C 2 275] ), table 19).

    These checks mainly concern :

    • ...

    You do not have access to this resource.

    Exclusive to subscribers. 97% yet to be discovered!

    You do not have access to this resource.
    Click here to request your free trial access!

    Already subscribed? Log in!


    The Ultimate Scientific and Technical Reference

    A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
    + More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
    From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

    This article is included in

    The superstructure of the building

    This offer includes:

    Knowledge Base

    Updated and enriched with articles validated by our scientific committees

    Services

    A set of exclusive tools to complement the resources

    Practical Path

    Operational and didactic, to guarantee the acquisition of transversal skills

    Doc & Quiz

    Interactive articles with quizzes, for constructive reading

    Subscribe now!

    Ongoing reading
    Inspection during installation
    Outline