2. Manufacturing control
All the minimum production control procedures for concretes intended for cast-in-place structures, precast structures, precast structural elements for buildings and civil engineering structures, whether manufactured on site, in ready-mix plants or precast plants, are governed by paragraph 9.9 of standard NF EN 206/CN. These operations come under the concrete producer's internal control, and the checks carried out mainly concern :
constituent materials ;
manufacturing equipment ;
production procedures ;
concrete properties.
Test and verification results must be documented in reports or, failing that, recorded. They can be requested or consulted by the prescriber and/or the project manager as part of his external...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Manufacturing control
Article included in this offer
"The superstructure of the building"
(
128 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!