5. Glossary
Additives: products added to the basic waterproofing material (polymer or bitumen) to form the waterproofing compound.
Assembly: all processes used to join panels (i.e., strips and/or sheets) to form a waterproof seal.
Calendering: a method of producing geomembranes that involves passing a molten waterproof compound between parallel rotating cylinders.
Calender: machine comprising cylinders used for the production of geomembranes by calendering.
Blistering: localized swelling of the top layer of a multilayer geomembrane caused by the expansion of gas trapped between two layers of the geomembrane, particularly gas resulting from the vaporization...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Public works and infrastructure
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Glossary
Bibliography
Websites
-
CFG – French Geosynthetics Committee
-
IGS – International Geosynthetics Society
- ...
Events
-
International Conference on Geosynthetics
Organized under the auspices of the International Geosynthetics Society (IGS), this congress takes place every four years: Paris (1977), Las Vegas (1982), Vienna (1986), The Hague (1990), Singapore (1994), Atlanta (1998), Nice (2002), Yokohama (2006), Guaruja/Sao Paulo (2010), Berlin (2014), Seoul (2018).
Regional...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference