8. Supervision of rehabilitation work
-
The two phases prior to execution of the work are :
Verification of the pipe's initial condition. This phase takes place at the start of the works, and involves visual or televised inspection to check that the condition of the pipe has not changed since the condition diagnosis study. A report (including a comparative report if necessary) is drawn up and submitted to the project manager (photo or video report);
verification of the pipe's reception condition. This phase follows the preparatory work (hydrocleaning, milling of obstacles) and is also the subject of a report submitted to the project manager (photo report, video cassette).
-
Monitoring the execution of rehabilitation work can vary greatly depending on the...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Supervision of rehabilitation work
Article included in this offer
"Public works and infrastructure"
(
88 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!