Supervision of rehabilitation work
Maintenance, diagnosis and rehabilitation of sewer systems
Article REF: C5230 V2
Supervision of rehabilitation work
Maintenance, diagnosis and rehabilitation of sewer systems

Author : Jean-Marc BERLAND

Publication date: August 10, 2013 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

8. Supervision of rehabilitation work

  • The two phases prior to execution of the work are :

    • Verification of the pipe's initial condition. This phase takes place at the start of the works, and involves visual or televised inspection to check that the condition of the pipe has not changed since the condition diagnosis study. A report (including a comparative report if necessary) is drawn up and submitted to the project manager (photo or video report);

    • verification of the pipe's reception condition. This phase follows the preparatory work (hydrocleaning, milling of obstacles) and is also the subject of a report submitted to the project manager (photo report, video cassette).

  • Monitoring the execution of rehabilitation work can vary greatly depending on the...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Public works and infrastructure"

( 88 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us