2. Material rotation study
2.1 Formwork tool routing
The formwork-tool routing will depend on the type of site: number of buildings to be erected, one after the other or at the same time, differences between buildings. This may result in different paths being taken. There are two possibilities: closed or open rotation.
SCROLL TO TOPLet's take the example of a building site comprising several buildings A, B, C, D. The schedule provided by the architect in the tender documents, or the work schedule submitted...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Material rotation study
Article included in this offer
"Preparing for construction"
(
117 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Also in our database
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!