Conclusion
Construction cycle. Documents and detailed scheme
Article REF: TBA528 V1
Conclusion
Construction cycle. Documents and detailed scheme

Author : Pierre SERIN

Publication date: September 10, 2017 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

3. Conclusion

Designing a formwork rotation for a project for which the company has been awarded a contract is a job that must be done successfully, as the financial equilibrium of the site often depends on it, and the company's survival may well depend on it.

In order to carry out the rotation study, the company needs to have access to a large library of job site reports, showing the times allocated and the times actually worked, as well as the equipment use sheets for the job site, compared with the equipment sheets drawn up by the formwork manufacturer.

Achieving optimum rotation is not easy on the first try, but don't despair.

The formwork is used by teams of "formworkers" supervised by a hierarchy; these teams must have been trained in the use of the equipment to achieve optimum yields, without damaging the equipment. The...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Preparing for construction"

( 117 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us