Construction cycle. Documents and detailed scheme
Article REF: TBA528 V1

Construction cycle. Documents and detailed scheme

Author : Pierre SERIN

Publication date: September 10, 2017 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

Overview

Read this article from a comprehensive knowledge base, updated and supplemented with articles reviewed by scientific committees.

Read the article

AUTHOR

 INTRODUCTION

The study of concreting cycles involves the rotation of formwork, the key component of the shell of a reinforced concrete building.

Starting with a description of the structure, we'll be looking at the hierarchy of constraints to be met, the number and size of teams ("floor" team, "wall" team, "prefabrication" team), their organization in co-activity for routine work and for all special points (gable walls, stairwells and elevators, etc.), as well as the equipment load plan (PPSPS for each company).

Safety must be integrated into every action. The results of this study will be recorded in summary documents and plans, which will be made available to all those involved in the construction process, and will form the "roadmap", the backbone of the structural work.

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


KEYWORDS

Floors   |   Concrete walls   |   Prefabrication

Ongoing reading
Construction cycle

Article included in this offer

"Preparing for construction"

( 117 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us