2. General
2.1 Documents to be supplied (GC 2)
The documents to be supplied pursuant to section 2.1 of article
floor plans showing the location of cooking appliances and reheating equipment, with their power ratings;
drawings and descriptions of power distribution and fuel storage ;
plans and descriptions of the...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
General
Article included in this offer
"Preparing for construction"
(
117 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Also in our database
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!