5. Storage and processing
5.1 Device packaging
1 – The complete assembly of the device and its wiring to the terminal block described in 1 must be carried out by the manufacturer prior to delivery.
2 – For dampers and dampers, the manufacturer must clearly indicate the direction of installation and air flow on the device.
3 – Before delivery, the unit must be suitably packaged to enable it to be stored under optimum conditions (e.g. shrink-wrapped in plastic).
4 – Storage must be protected from the elements, water, humidity, shocks and soiling from splashes of...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Storage and processing
Article included in this offer
"Preparing for construction"
(
117 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Also in our database
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!