1. Construction and smoke ventilation of open spaces
This technical instruction describes a number of configurations and proposes solutions that are deemed to satisfy the smoke sheltering requirement. Constructions which differ from these configurations, either by their architecture, their dimensions, or the dimensions of their adjacent volumes (for example: ceiling height greater than 4 m), require a special study, based on the models used to draw up this technical instruction, and will be examined by the Central Safety Commission, after consulting the Departmental Safety and Accessibility Advisory Commission (CCDSA).
A decree dated March 22, 2004 specifies that hoppers forming a hall, created by the possible communication between three levels, are cleared of smoke by applying Technical Instruction no. 246 (§ 6.2.4 and 6.3.4 of
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Construction and smoke ventilation of open spaces
Article included in this offer
"Preparing for construction"
(
117 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Also in our database
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!