6. Safety precautions before using scaffolding
6.1 Preliminary examinations and checks
Regulatory checks are provided for in the decree of December 21, 2004. They include a pre-commissioning check at each installation site:
when first used;
when scaffolding is dismantled and then reassembled;
following changes in conditions of use, atmospheric conditions or the environment, as these three factors are likely to affect the safe use of the scaffolding;
following an interruption in use of at least one month.
This check includes
a suitability test ;
an assembly and installation test ;
...