4. Scaffolding acceptance

4.1 Post-delivery operations

Once the scaffolding has been erected :

  • the site manager checks that the scaffolding complies with the specifications, the provisional plan and the regulations (Decree of December 21, 2004);

  • acceptance is evidenced by a written document signed jointly by the specialist installer and the user: the verification report, before the scaffolding is put into service (or put back into service), the contents of the report, together with the verification report and the summary sheet drawn up by SFECE.

All signed documents must be kept on site, and a photocopied copy kept at head office in the site file.

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Preparing for construction

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Scaffolding acceptance