4. Scaffolding acceptance
4.1 Post-delivery operations
Once the scaffolding has been erected :
the site manager checks that the scaffolding complies with the specifications, the provisional plan and the regulations (Decree of December 21, 2004);
acceptance is evidenced by a written document signed jointly by the specialist installer and the user: the verification report, before the scaffolding is put into service (or put back into service), the contents of the report, together with the verification report and the summary sheet drawn up by SFECE.
All signed documents must be kept on site, and a photocopied copy kept at head office in the site file.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Scaffolding acceptance
Article included in this offer
"Preparing for construction"
(
117 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
- (1) - SERIN (P.) et al - Sécurité et protection de la santé dans le BTP, - ETI Construction, http://publications.eti-construction.fr/publications/securite-et-protection-de-la-sante-dans-le-btp-ti309/ ...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!