Site prevention during the design phase – Example of a "small structure" or a single-family home
Site safety
Article REF: TBA239 V1
Site prevention during the design phase – Example of a "small structure" or a single-family home
Site safety

Author : Pierre SERIN

Publication date: May 10, 2021 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

4. Site prevention during the design phase – Example of a "small structure" or a single-family home

Someone has decided to build their own home. He or she has chosen from among the builders of individual homes, who may be craftsmen or small building firms, and who may or may not be members of the CAPEB.

This person is therefore the "project owner – MOA", i.e. the person for whom the construction is to be carried out, and as such is responsible for ensuring construction safety from design to acceptance. As such, they are responsible for ensuring the safety of the building from design to handover, and for coordinating SPS (safety and health protection). She will therefore have to follow a procedure.

4.1 First phase: from project to signature of construction contract

  • Designation of the competent person to carry...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
Site prevention during the design phase – Example of a "small structure" or a single-family home

Article included in this offer

"Preparing for construction"

( 117 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us